advertisement

Panels transported from Fulton to Columbia for new parking garage

November 16, 2010 | 8:33 p.m. CST
Wayne Shoemaker watches as the construction crew begins to hoist the prefabricated panel with a crane at the new parking garage in downtown Columbia. The 42 by 10 feet panels are 10 inches thick and are transported from Fulton one-by-one to be positioned and attached to the structure.
advertisements