Repairing power lines in Campbell
February 3, 2009 | 8:20 p.m. CST
From left, Tim Wilson, Josh Koch and Chip Duren work to repair power lines on Locust Street in Campbell on Saturday morning. The temperature warmed to 48 degrees on Saturday, melting much of the accumulated ice that brought down trees and power lines in the Bootheel area and states surrounding Missouri.
RELATED STORIES: Columbia linemen go to Campbell
Like the Missourian?
Support us with Kachingle!
advertisements
